American made of solid aluminum, this heavy duty square backing plate gives a solid foundation to any gooseneck light. Choose from more than a dozen durable powder coat finishes and two gooseneck arm receiver sizes.
Manufactured in the U.S.A.
Please Note: Listing is for the Heavy Duty Baking Plate ONLY, gooseneck not included
Gooseneck Arms that Require 1/2" Opening: G1, G3, G5, G11, G12, G16, G26 and G35
Standard lead time is 7-14 business days. This is not applicable to commercial orders, Quick Ship lighting, or furniture. Quick Ship lighting has a standard lead time of 5-7 business days. Furniture requires a 4-6-week lead time. Copper and brass products have a longer lead time and may take up to 4 weeks to manufacture.
Returns are accepted for most products within 30 days of delivery. We do not accept returns on fixtures that have been installed or are damaged. There are no returns accepted on furniture items, natural metal products, or products assembled with GU24 sockets, integrated LED's or light bulbs. All fixtures undergo a strict quality control evaluation to ensure they meet our high standards; however, some minor blemishes may occur due to our hands-on construction and manufacturing processes. These blemishes do not affect the functionality of the fixture.
Finish Care & Maintenance
No metal fixture, no matter the finish, is guaranteed against corrosion, especially in salt air environments. If your fixture will be installed in a location near salt water, we recommend cleaning it monthly.
If your fixture is not installed in a location near salt water, we recommend periodic cleaning with a mild soap-and-water wash and gentle buffing to extend the life of our painted finishes.